Streamline Pile Driving with Smartphone Surveying! Beginner's Guide to LRTK

タイマーアイコン.jpeg
この記事は平均9分15秒で読めます
2025年10月06日 掲載
All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Pile driving on-site is a critical process that determines the precision and quality of construction projects. However, traditional methods involved time-consuming and labor-intensive positioning (surveying and marking pile locations), posing challenges for those without experience. Amidst this, the smartphone surveying solution “LRTK,” combining smartphones with the latest RTK technology, has emerged. It enables even beginners to easily navigate to piles, introducing a new construction style that is gaining attention.


This article clearly explains the challenges faced on-site during pile driving guidance, traditional methods, the evolution of smartphone surveying and the features of LRTK, as well as practical application methods and the benefits of implementation.


Challenges and Traditional Methods in Pile Driving Guidance

When driving piles to mark the positions of columns or structures at construction sites, the “pile driving guidance” process—precisely surveying and marking locations beforehand—is essential. Traditionally, surveying these pile positions involved manual labor using surveying instruments like tape measures, transits, and automatic levels, often requiring multiple workers. For example, the process involved measuring distances from reference points on drawings to mark the ground, then driving wooden or steel stakes into those marked spots. However, this manual-labor-intensive method presented several challenges.


Traditional surveying relied on equipment like tripod levels and transits, with stakes positioned manually. The process was cumbersome, prone to human error, time-consuming, and inherently susceptible to mistakes.


Furthermore, it required specialized surveying knowledge and experience, making reliance on skilled workers unavoidable. Failing to drive piles precisely could cause structural misalignment, leading to costly corrections, project delays, and increased costs in later phases. Even slight positional deviations can impact the overall safety of a building, making the high-precision guidance of pile driving a critically important challenge.


Against this backdrop, equipment development to improve work efficiency has been ongoing. For example, Topcon's “Pile Navi” layout navigator is widely used on many sites as a device that allows one person to easily set up, survey, and drive piles. While specialized equipment enables labor savings, high initial costs and the time required to master operation presented barriers for small-to-medium-sized sites and beginners. “Is there a way to guide pile placement more easily and accurately for anyone?” – This led to the emergence of pile driving guidance using smartphones.


The Evolution of Smartphone Surveying and LRTK's Features

Recent advancements in smartphone technology are making it possible to perform surveying using only a smartphone, without dedicated surveying equipment. The key to this is a positioning technology called RTK. RTK (Real Time Kinematic) corrects errors in satellite positioning systems like GPS, enabling real-time location determination with centimeter-level accuracy. Traditionally, specialized equipment like antennas, high-performance GNSS receivers, and wireless devices was required. However, compact devices integrating all these components have emerged in recent years. LRTK is one such device—an all-in-one RTK positioning unit that attaches to a smartphone.


Using LRTK transforms your smartphone into a high-precision GNSS surveying instrument. Its key feature is displaying stakeout coordinate data from design drawings on your smartphone screen, allowing you to instantly verify deviations from your current position in real time. For example, it provides digital guidance like “0.05m east and 0.10m north to the target point,” enabling precise alignment. Instead of measuring distances with a tape measure or repeatedly walking between stakes as before, the smartphone navigates you to the stake. This eliminates the hassle of manual calculations and staring at drawings, significantly reducing surveying errors.


Furthermore, LRTK's ability to utilize AR (Augmented Reality) technology via the smartphone app is noteworthy. Virtual arrows and markers are displayed through the smartphone camera, visually guiding you to the exact location where the stake should be driven. The combination of high-precision GNSS positioning and AR enables intuitive navigation by overlaying stake positions onto the real-world scenery.


This means even beginners without surveying expertise can reach the correct location simply by following on-screen instructions. In fact, the clear visual guidance provided by AR is known to aid workers' spatial awareness and reduce rework caused by mistakes.


Smartphone surveying + LRTK also offers cost advantages. By leveraging the smartphones most people already own, it eliminates the need to purchase expensive dedicated surveying equipment, keeping initial investment low. The devices are palm-sized, with built-in batteries and antennas, designed for easy handling and durability on-site. In short, LRTK's strength lies in its simplicity—“all you need is a smartphone”—enabling anyone to perform centimeter-accurate surveying comparable to traditional equipment.


Practical Implementation of Smart Construction Using Pile Driving Coordinates

Now, let's look at the actual process of performing pile driving guidance using smartphone surveying with LRTK. First, prepare pile driving coordinate data (latitude/longitude and plane coordinates for the intended pile locations) based on the construction plan. Import these coordinates into the LRTK smartphone app or cloud beforehand. On-site, attach the LRTK device to the smartphone, launch the app, and select the desired pile point.


The smartphone screen displays the direction and distance to the selected pile point, and the worker moves according to this guidance. For example, in the image above, the blue arrow indicates the target pile position is approximately 6.34m ahead in the direction it points. As the distance decreases and the worker approaches the destination, the display gradually approaches 0m, indicating arrival at the target location. Once at the specified position, the worker drives the pile into the ground. This ensures the pile is installed precisely at the designed location.


The LRTK app's AR navigation function provides guidance like a car navigation system, such as “○○m to the pile” or “proceed in this direction.” This eliminates the need to search by intuition while consulting maps or drawings.


This functionality is only possible because it can position both the current location and the target point with centimeter-level accuracy, allowing even beginners to pinpoint the pile driving location without getting lost.


In actual LRTK field applications, there are reported cases where “workers saved photos with location data to the cloud beforehand and used them to navigate directly to repair sites without getting lost.”


For pile driving, as long as coordinates are shared, anyone can place piles at the exact same points. This prevents work from becoming dependent on specific individuals and boosts overall team productivity.


Furthermore, this smartphone surveying workflow contributes to reducing training costs. Traditionally, teaching surveying techniques to newcomers took considerable time. However, simply following LRTK's on-screen guidance allows for quicker mastery, enabling even inexperienced workers to participate in pile driving as productive members immediately. Even when there are few veteran technicians familiar with the site, the smartphone guidance ensures error-free work, increasing flexibility in personnel deployment.


Detailed Features and Implementation of LRTK

LRTK is a smart construction platform comprising hardware devices, a smartphone app, and cloud services. First, the LRTK hardware device attaches to the top of a smartphone (compatible with both Android and iPhone). This device integrates a high-precision GNSS antenna, receiver, battery, and communication module, and is built to withstand rough handling on site. Only one smartphone is required; no dedicated controllers are needed. Usage is simple: attach the device to the smartphone, power it on, and connect to the app. RTK positioning starts immediately, providing centimeter-level accuracy for your current location.


The setup process involves first configuring the LRTK device and app. The device connects to your smartphone via Bluetooth or Wi-Fi and uses correction data (either internet-based data for network RTK or signals like Japan's Michibiki satellite CLAS) to enhance positioning accuracy. Set the reference coordinate system in the app and import pile placement coordinate data from construction drawings to complete setup. After that, simply walk the site with your smartphone and locate pile positions as guided by the app.


A convenient LRTK feature allows attaching photos and notes to positioned points for cloud-based recording and sharing. By saving each pile's installation location with photos to the cloud database during construction, managers in the office can monitor progress in real time. It also makes it easy to review later where piles were driven. Since pile driving data in the cloud is shared across the team, handoffs and reporting become smoother. Furthermore, once saved, coordinate information can be reused for future expansion work or inspection tasks. For instance, if you need to drive an additional pile in the exact same location as a previously driven pile, you can retrieve the past data in the app and use it for guidance to reproduce the exact position without error. This represents an effective use of data that was difficult with traditional paper ledgers.


Furthermore, LRTK devices feature tilt compensation. This allows them to correct and acquire the coordinates at the tip even when the surveying pole is tilted. This maintains accuracy even when obstacles prevent the pole from being held perfectly vertical, making it suitable for pile driving surveys in confined spaces or on uneven terrain. As described above, while LRTK offers diverse functionality, its implementation and setup are designed to be simple and field-friendly. Even for first-time users, comprehensive support information and manuals (including in-app guides) from the provider ensure ease of use.


Benefits of LRTK Implementation and Future Prospects

Let's revisit the benefits gained by implementing the LRTK smartphone-based pile driving guidance system. First, regarding cost reduction, it can decrease the number of times dedicated survey technicians or external surveyors are required, leading to lower labor and outsourcing costs. Additionally, the initial implementation cost is lower than purchasing a full set of expensive surveying equipment. Next, regarding work efficiency, a single worker can set up numerous pile placement points in a short time. Real-time guidance reduces the need for re-surveying or re-marking, leading to shorter project timelines. This effect is particularly pronounced on large-scale sites with hundreds of survey points. Since accuracy is ensured even without highly skilled personnel, staffing flexibility increases, boosting the overall operational efficiency of the team.


Enhanced safety is another key benefit. Streamlining pile driving surveying reduces the time workers spend in hazardous areas. It lowers the risk of prolonged surveying near heavy machinery or moving vehicles, and eases the burden during high-heat summer work or on sites with poor footing. Furthermore, eliminating errors in pile placement helps prevent accidents and issues caused by construction defects. The digital precision also offers a significant benefit for field workers: the peace of mind that eliminates the uncertainty of wondering, “Is this the right spot?”


Looking ahead, pile driving guidance technology is expected to become increasingly digital and smart. Smartphone surveying devices like LRTK are anticipated to become smaller and more powerful. In the future, they might integrate with smart glasses (AR glasses) to enable hands-free confirmation of pile positions. Even now, development of helmet-integrated products within the LRTK series is underway, making an environment where workers can constantly obtain high-precision positioning information without conscious effort increasingly realistic. Integrating navigation functions directly into construction machinery itself is also a trend. In the future, heavy equipment operators might be able to excavate and drive piles while confirming pile positions on a smartphone screen, or automated pile driving point marking using drones could become a reality. As the foundational positioning platform, LRTK will continue to grow in prominence.


This concludes our overview of pile driving guidance using smartphone surveying with LRTK, covering challenges, solutions, and implementation benefits. Improving pile driving accuracy and efficiency is a key area of construction DX benefiting everyone from beginners to veterans. With LRTK, which can be started using a simple smartphone app and compact GNSS device, you can simultaneously achieve increased site productivity and enhanced safety management. If you are interested, please visit the LRTK product page for detailed information. Why not incorporate cutting-edge smartphone surveying technology into your site and experience the new standard in pile driving guidance?


LRTK supercharges field accuracy and efficiency

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

For more details about LRTK, please see the links below.

 