top of page

Solar Power

Simulation

Service overview
Drone survey (UAV survey)
Step1: Drone survey (UAV)
By projecting a laser onto the ground surface with a laser drone, it is possible to obtain high-definition information such as terrain undulations, trees, and buildings around power plants.
It can also be used for surveying difficult-to-reach mountainous areas, slopes, wide areas of land, and areas with large elevation differences.
Although it depends on the conditions, we have a track record of topographical surveying of 400ha.
​We will also create data before and after felling by separating the ground surface and tree data from the acquired data.
ドローンの様子

Creating a Module Layout

bottom of page