top of page

With the technology of ​IT
Contributing to the spread of clean energy

We mainly provide 3D design and power generation analysis for solar power plants.
From business plan design to PR guarantee negotiation, we will respond to each needs.
List of services
​太陽光発電所を施工、購入する際の様々なニーズにお応えいたします。
3Dモデル作成
ドローン_アイコン
太陽光パネルアイコン
発電量解析アイコン
PR保証アイコン
02.
04.
01.
事業計画で発電量を見積る際の
設計をします。
計画設計後、実施工に際して
​架台の杭座標を出力します。
詳細な3Dモデルから
発電量レポートを作成します。
PR保証の際に技術的な視点から
​交渉をサポートいたします。
ドローンの様子
01.
● Step1: drone survey
With laser drone surveying, the undulations of the ground surface, trees,
Acquire data such as buildings.
Improve the accuracy of the 3D model used in power generation analysis.
-Step2: 3D model creation
We will create a 3D terrain model from the data obtained by drone surveying.
Restore trees and buildings in detail. We can also provide a shareable 3D model viewer.
影の動画
​影の解析
●Step3:Shadow Analysis
Based on the tree 3D model acquired by drone surveying, we analyze where the shadow of the tree falls on the pedestal.
Visualize which mount will be shaded at the vernal equinox, summer solstice, and winter solstice.
You can get higher power generation by moving the cradle that casts the shadow.
架台レイアウト
-Step4: Frame layout
Considering the position, azimuth angle, and overload rate of the mounting frame, we will consider the mounting frame layout that is close to the ideal.
レイアウト最適化
● Step 6: Restoration of the frame and optimization of the layout
Create several layout plans and analyze the amount of power generation for each.
​ Select the layout with the highest power generation. We will derive a layout that is close to the ideal.
After the detailed design, we will output the pile coordinates of the trestle during the construction work.

● Output of pile coordinates

After laying out the panel, it is possible to output the pile coordinates of the mounting frame.
​ Outputs the pile position (x, y, z coordinates) and pile depth that can be used in construction.
​ Consider a layout that avoids rocks and stumps, and a layout that takes into consideration the depth of embedment.
02.
2D設計図
03.
Power generation evaluation service
When purchasing a power plant, the contents of the power generation report submitted by the seller,
​We will compare it with our power generation report.
●Preparation of power plant analysis evaluation report
Create a power generation evaluation report based on highly accurate analysis from a detailed 3D model.
We summarize the losses due to trees, buildings, natural disasters, etc. around the power plant and calculate the predicted power generation amount. Calculate the amount of power generation that has a technical basis.
2D設計図2
シュミレーション結果 和訳
We support EPC from a technical point of view when guaranteeing PR value to business owners.
We respond to the voices that negotiations are difficult because the simulation report uses a lot of technical terms, the loss value standard is unclear, and it is written in English.

● PR guarantee negotiation
On behalf of ​EPC, we have the expertise to negotiate technical terminology and loss values. We can also negotiate in English.
04.

​Reference case 1 Layout optimization

地形3Dデータ

​ Terrain Creation

パネル3Dデータ

panel layout

シュミレーション結果 和訳

PVsystSimulation

PvSystロゴ
パネル3Dデータ

panel layout

シュミレーション結果 和訳

PVsystSimulation

PvSystロゴ

​Create topography from data provided by customer

​ Layout the mount with logic 1 and logic 2

Simulation with PVsyst​
Logic 1 is better
The amount of power generated is higher than Logic 2.
​ sure to be more

​ logic 1A and
Logic 1B
Lay out the mount with ​

Logic 1A is better
The amount of power generated is greater than Logic 1B.
​ sure to be more
repeat the same work
​ optimize layout

Reference project video

This is a reference example of PVsyst power generation amount simulation based on 3D model.

Click here for inquiries and requests

NEWS

No posts published in this language yet
Once posts are published, you’ll see them here.
bottom of page