top of page

Solar Power

Simulation

Sep2: 3D model creation
We will create a 3D terrain model from the data obtained by drone survey.
Not only the trees around the power station, but also structures such as buildings will be reconstructed in detail.
From the created tree model, you can visualize and study the height of the tree and how the power plant will be shaded.
​In addition, based on the floor plan provided by the customer and the base map information of the Geospatial Information Authority of Japan
It is also possible to create 3D terrain models.

Creating 3D data

太陽光発電3D設計を空から見た様子
太陽光発電3D設計を斜め上から見た様子

We create 3D terrain data using the Degital Elevation Model (DEM), which can be obtained from the Geospatial Information Authority of Japan.

If you have topographic data from aerial surveying or drone laser, we will use that.
When using data from the Geospatial Information Authority of Japan, the mesh will be accurate to 5 or 10 meters.


* When using data from the Geospatial Information Authority of Japan, the mesh will have an accuracy of 5m or 10m.

We create 3D terrain data using the Degital Elevation Model (DEM), which can be obtained from the Geospatial Information Authority of Japan.

If you have topographic data from aerial surveying or drone laser, we will use that.
When using data from the Geospatial Information Authority of Japan, the mesh will be accurate to 5 or 10 meters.


* When using data from the Geospatial Information Authority of Japan, the mesh will have an accuracy of 5m or 10m.

3D model How to operate

We create 3D terrain data using the Degital Elevation Model (DEM), which can be obtained from the Geospatial Information Authority of Japan.

If you have topographic data from aerial surveying or drone laser, we will use that.
When using data from the Geospatial Information Authority of Japan, the mesh will be accurate to 5 or 10 meters.


* When using data from the Geospatial Information Authority of Japan, the mesh will have an accuracy of 5m or 10m.

太陽光発電
3D設計モデル

We create 3D terrain data using the Degital Elevation Model (DEM), which can be obtained from the Geospatial Information Authority of Japan.

If you have topographic data from aerial surveying or drone laser, we will use that.
When using data from the Geospatial Information Authority of Japan, the mesh will be accurate to 5 or 10 meters.


* When using data from the Geospatial Information Authority of Japan, the mesh will have an accuracy of 5m or 10m.

We create 3D terrain data using the Degital Elevation Model (DEM), which can be obtained from the Geospatial Information Authority of Japan.

If you have topographic data from aerial surveying or drone laser, we will use that.
When using data from the Geospatial Information Authority of Japan, the mesh will be accurate to 5 or 10 meters.


* When using data from the Geospatial Information Authority of Japan, the mesh will have an accuracy of 5m or 10m.

We create 3D terrain data using the Degital Elevation Model (DEM), which can be obtained from the Geospatial Information Authority of Japan.

If you have topographic data from aerial surveying or drone laser, we will use that.
When using data from the Geospatial Information Authority of Japan, the mesh will be accurate to 5 or 10 meters.


* When using data from the Geospatial Information Authority of Japan, the mesh will have an accuracy of 5m or 10m.

We create 3D terrain data using the Degital Elevation Model (DEM), which can be obtained from the Geospatial Information Authority of Japan.

If you have topographic data from aerial surveying or drone laser, we will use that.
When using data from the Geospatial Information Authority of Japan, the mesh will be accurate to 5 or 10 meters.


* When using data from the Geospatial Information Authority of Japan, the mesh will have an accuracy of 5m or 10m.

We create 3D terrain data using the Degital Elevation Model (DEM), which can be obtained from the Geospatial Information Authority of Japan.

If you have topographic data from aerial surveying or drone laser, we will use that.
When using data from the Geospatial Information Authority of Japan, the mesh will be accurate to 5 or 10 meters.


* When using data from the Geospatial Information Authority of Japan, the mesh will have an accuracy of 5m or 10m.

We create 3D terrain data using the Degital Elevation Model (DEM), which can be obtained from the Geospatial Information Authority of Japan.

If you have topographic data from aerial surveying or drone laser, we will use that.
When using data from the Geospatial Information Authority of Japan, the mesh will be accurate to 5 or 10 meters.


* When using data from the Geospatial Information Authority of Japan, the mesh will have an accuracy of 5m or 10m.

太陽光発電 ドローン測量

We create 3D terrain data using the Degital Elevation Model (DEM), which can be obtained from the Geospatial Information Authority of Japan.

If you have topographic data from aerial surveying or drone laser, we will use that.
When using data from the Geospatial Information Authority of Japan, the mesh will be accurate to 5 or 10 meters.


* When using data from the Geospatial Information Authority of Japan, the mesh will have an accuracy of 5m or 10m.

Creating a Module Layout