top of page

Solar Power
Simulation
Service overview
Drone survey (UAV survey)
Step1: Drone survey (UAV)
By projecting a laser onto the ground surface with a laser drone, it is possible to obtain high-definition information such as terrain undulations, trees, and buildings around power plants.
It can also be used for surveying difficult-to-reach mountainous areas, slopes, wide areas of land, and areas with large elevation differences.
Although it depends on the conditions, we have a track record of topographical surveying of 400ha.
We will also create data before and after felling by separating the ground surface and tree data from the acquired data.

bottom of page