We mainly provide 3D design and power generation analysis for solar power plants.
From business plan design to PR guarantee negotiation, we will respond to each needs.
List of services
太陽光発電所を施工、購入する際の様々なニーズにお応えいたします。




02.
04.
01.
事業計画で発電量を見積る際の
設計をします。
計画設計後、実施工に際して
架台の杭座標を出力します。
詳細な3Dモデルから
発電量レポートを作成します。
PR保証の際に技術的な視点から
交渉をサポートいたします。
01.
● Step1: drone survey
With laser drone surveying, the undulations of the ground surface, trees,
Acquire data such as buildings.
Improve the accuracy of the 3D model used in power generation analysis.
-Step2: 3D model creation
We will create a 3D terrain model from the data obtained by drone surveying.
Restore trees and buildings in detail. We can also provide a shareable 3D model viewer.
影の解析
●Step3:Shadow Analysis
Based on the tree 3D model acquired by drone surveying, we analyze where the shadow of the tree falls on the pedestal.
Visualize which mount will be shaded at the vernal equinox, summer solstice, and winter solstice.
You can get higher power generation by moving the cradle that casts the shadow.
-Step4: Frame layout
Considering the position, azimuth angle, and overload rate of the mounting frame, we will consider the mounting frame layout that is close to the ideal.
● Step 6: Restoration of the frame and optimization of the layout
Create several layout plans and analyze the amount of power generation for each.
Select the layout with the highest power generation. We will derive a layout that is close to the ideal.
After the detailed design, we will output the pile coordinates of the trestle during the construction work.
● Output of pile coordinates
After laying out the panel, it is possible to output the pile coordinates of the mounting frame.
Outputs the pile position (x, y, z coordinates) and pile depth that can be used in construction.
Consider a layout that avoids rocks and stumps, and a layout that takes into consideration the depth of embedment.
02.