top of page

Business plan design service

In the business plan design service,
We will make a design for making a business plan and estimating the amount of power generation.
The purpose is to improve the income and expenditure plan by increasing the planned power generation amount.
The amount of power generated varies depending on the layout of the mounting frame.
​ Detailed 3D model reproduction, 3D layout and quantitative power generation analysis will be laid out so that higher power generation can be obtained.
14:30.png

Step3: Shadow analysis

コメント 2021-12-21 173556.png

Step4: Frame layout

コメント 2021-12-21 173556.png

Step6: Layout optimization

コメント 2021-12-28 131310.png

​Reference case 1 Layout optimization

コメント 2021-12-28 112120.png

​ Terrain creation

コメント 2021-12-21 173556.png

panel layout

シ��ュミレーション結果 和訳

PVsystSimulation

Logo-PVsyst.png
コメント 2021-12-21 173556.png

panel layout

シュミレーション結果 和訳

PVsystSimulation

Logo-PVsyst.png

​Create topography from data provided by customer

​logic 1 and logic 2
Lay out the mount with ​

Simulation with PVsyst​
Logic 1 is better
The amount of power generated is higher than Logic 2.
​ sure to be more

​ logic 1A and
Logic 1B
Lay out the mount with ​

Logic 1A is better
The amount of power generated is greater than Logic 1B.
​ sure to be more
repeat the same work
​ optimize layout

bottom of page